The desire to be able to process sewage sludge for longer

May 6, 2023

Our client NV Slibverwerking Noord-Brabant (SNB) in Moerdijk has plans to keep processing sewage sludge for longer than originally intended. Demand for sustainable sludge processing will only increase in the coming years. SNB has set up its plant so that it is ready for the future; sludge incineration plays a crucial role in the transition to a circular society.

To keep the plant — originally designed for 25 years — operating well beyond that period, a service-life extension study was carried out. On the technical side, SNB, together with AMBC (Asset Management and Business Consultancy), calculated the service-life extension on the basis of risk management.

To carry out the complex calculations for the extended life cycle, SNB used the software of Clarify Risk Management.

This is what SNB says about it:

“For us this resulted in a clear and well-founded report that lets us look towards this challenging future with confidence. Because we now have Clarify in-house, we can also monitor and adjust our risk-driven maintenance process better in the future wherever necessary. This optimisation of the current plant fits perfectly with our aim to keep advancing circularity.”

← Back to blog